Mike O’Callaghan-Pat Tillman Memorial Bridge, Boulder City, NV: Location, Length, Height, Toll, History & Facts

Mike O’Callaghan-Pat Tillman Memorial Bridge offers one of the most breathtaking views in the American Southwest. From its walkway, about 890 feet above the Colorado River, you look straight up Black Canyon to the curved concrete face of Hoover Dam. The bridge was built as the centerpiece of the Hoover Dam Bypass. It opened to traffic on October 19, 2010, and carries Interstate 11 and US 93 between Nevada and Arizona. Its 1,060-foot twin-rib concrete arch is the longest concrete arch in the Western Hemisphere. It’s the second-highest bridge in the United States and the world’s highest concrete arch bridge. USA Today called it “America’s Newest Wonder.” It’s free to drive or walk.

Mike O'Callaghan-Pat Tillman Memorial Bridge, Boulder City, NV

Mike O’Callaghan-Pat Tillman Memorial Bridge Key Facts

Detail Information
Other names Hoover Dam Bypass Bridge; Hoover Dam Bridge
Location Black Canyon of the Colorado River, about 1,500 ft downstream of Hoover Dam, near Boulder City, Nevada, linking Nevada and Arizona
Coordinates Approx. 36.0125° N, 114.7417° W
Highways Interstate 11 and US Route 93
Bridge type Open-spandrel deck arch with twin concrete arch ribs (concrete-steel composite)
Project start Approach work began in 2003; arch contract awarded October 2004; bridge construction began early 2005
Dedicated October 14, 2010
Opened to pedestrians October 16, 2010
Opened to traffic October 19, 2010
Total bypass project cost About $240 million (completed on budget)
Bridge cost About $114 million
Total length About 1,900 ft (579 m)
Arch span About 1,060 ft (323 m)
Height above the river About 890 ft (271 m)
Tallest columns About 290 ft
Lanes 4 (2 in each direction)
Pedestrian walkway Upstream side, with views of Hoover Dam
Records Longest concrete arch in the Western Hemisphere; world’s highest concrete arch bridge; second-highest bridge in the US
Named for Mike O’Callaghan, former Nevada governor, and Pat Tillman, NFL player and U.S. Army Ranger
Toll None
Time zones Nevada: Pacific Time (UTC−8 / UTC−7 with daylight saving). Arizona: Mountain Standard Time all year (UTC−7)

High Above Black Canyon

The bridge spans Black Canyon, the deep, rocky gorge carved by the Colorado River just below Hoover Dam. The Nevada end lies near Boulder City, about 30 miles southeast of Las Vegas. The Arizona end connects with US 93 heading south toward Kingman and Phoenix.

The bridge sits about 1,500 feet downstream of Hoover Dam. From the walkway, visitors see the dam’s massive curved wall, its intake towers, the Colorado River far below, and the rugged desert cliffs of Black Canyon on both sides.

The Numbers Behind the Arch

The bridge is a deck arch, with the roadway resting on columns that stand on a giant arch springing from the canyon walls.

  • The bridge deck is about 1,900 feet long.
  • The twin concrete arch ribs span about 1,060 feet across the canyon.
  • The deck sits about 890 feet above the Colorado River. Only Colorado’s Royal Gorge Bridge is higher in the US.
  • Its tallest precast concrete columns rise about 290 feet.
  • The bridge carries four lanes of traffic, two in each direction.

It was the first concrete-steel composite arch bridge built in the United States. The two arch ribs are made of concrete, connected by steel struts, and support a steel and concrete deck.

Free to Cross

There’s no toll on the Mike O’Callaghan-Pat Tillman Memorial Bridge. Tips for visiting:

  • Drivers cross on I-11 and US 93 between Las Vegas and Arizona. Stopping on the bridge isn’t allowed.
  • Walkers can visit the pedestrian walkway on the upstream side. Use the parking lot on the Nevada side, off the Hoover Dam Access Road, and follow the trail and stairs up to the bridge.
  • The walkway has interpretive displays about the bridge’s construction and the two men it honors.
  • Summer temperatures in Black Canyon can soar above 100°F, and there’s little shade on the bridge. Visit early in the morning or late in the day, and bring water.
  • When crossing between Nevada and Arizona, remember that Arizona doesn’t observe daylight saving time. In winter, Arizona is one hour ahead of Nevada.

Why a Bypass Was Needed

For more than 70 years, US 93 crossed the Colorado River on top of Hoover Dam itself. The route wound down into the canyon on narrow, curving roads with hairpin turns and blind curves. Traffic slowed to a crawl, especially as more trucks and tourists traveled between Las Vegas and Phoenix.

Federal and state agencies planned a new route, the Hoover Dam Bypass, with about 2.2 miles of new highway in Nevada, 1.1 miles in Arizona, and a major new bridge across Black Canyon. The bypass would let through traffic skip the dam entirely, speeding up travel and making the dam area more enjoyable for visitors.

Building Across the Canyon

Construction on the approach roads began in 2003, and the contract for the arch bridge was awarded in October 2004. Building a huge arch across a canyon nearly 900 feet deep was an enormous challenge.

Workers used a high-line cable crane system. Steel cables more than 2,000 feet long were stretched across the canyon, supported by towers on each side, so the crane could lift materials and equipment out over the gorge. The concrete arches were built out from each canyon wall in segments, held in place by temporary cable stays until the two halves met in the middle.

The bridge was dedicated on October 14, 2010. A grand opening celebration followed, pedestrians and cyclists crossed on October 16, and vehicle traffic began on October 19, 2010. The entire Hoover Dam Bypass project was completed on budget at about $240 million.

Honoring Two American Heroes

In late 2004, Nevada Governor Kenny Guinn and Arizona Governor Janet Napolitano announced that the bridge would be named for two men who represented the best of both states.

Mike O’Callaghan was a decorated Korean War veteran who served as Governor of Nevada from 1971 to 1979. He was widely respected for his integrity and his devotion to public service, and he later became the executive editor of the Las Vegas Sun.

Pat Tillman was a star safety for the Arizona Cardinals who left his NFL career after the September 11 attacks to enlist in the U.S. Army. He became an Army Ranger and died while serving in Afghanistan in 2004. He is remembered as a symbol of selfless service.

A Memorial Plaza at the bridge honors both men.

Things to Do Nearby

  • Hoover Dam, just upstream, offers visitor center exhibits and guided tours of the dam and power plant.
  • Lake Mead National Recreation Area, behind the dam, has boating, swimming, hiking and scenic drives.
  • The Historic Railroad Trail near Boulder City follows an old railroad route through tunnels with views of Lake Mead.
  • Boulder City, the town built to house Hoover Dam workers, has a charming historic downtown and museums.
  • Black Canyon Water Trail kayak and raft trips float the Colorado River beneath the bridge.

FAQs

Q1. Is there a toll on the Mike O’Callaghan-Pat Tillman Memorial Bridge?

A. No. The bridge is free to drive and walk.

Q2. How long is the Mike O’Callaghan-Pat Tillman Memorial Bridge?

A. The bridge is about 1,900 feet long, with a 1,060-foot arch span.

Q3. How high is the Hoover Dam Bypass Bridge?

A. The deck sits about 890 feet above the Colorado River.

Q4. When did the Mike O’Callaghan-Pat Tillman Memorial Bridge open?

A. It opened to pedestrians on October 16, 2010, and to traffic on October 19, 2010.

Q5. Is it the highest bridge in the United States?

A. It’s the second-highest bridge in the US, after the Royal Gorge Bridge in Colorado.

Q6. Can you walk across the Hoover Dam Bypass Bridge?

A. Yes. A pedestrian walkway on the upstream side offers views of Hoover Dam.

Q7. Who are Mike O’Callaghan and Pat Tillman?

A. Mike O’Callaghan was a former Nevada governor and Korean War veteran. Pat Tillman was an NFL player who became an Army Ranger and died while serving in Afghanistan.

Q8. What highways cross the bridge?

A. Interstate 11 and US Route 93 cross the bridge between Nevada and Arizona.

Q9. How much did the Hoover Dam Bypass cost?

A. The entire bypass project cost about $240 million, and the bridge portion about $114 million.

Q10. Why was the bridge built?

A. It was built to move US 93 traffic off the top of Hoover Dam, replacing a slow, winding route with a faster crossing.

Post Comment